Original Factory Frame Scaffolding System - Metal Plank/Steel Plank: TJHY-SP3 – Huayou
Original Factory Frame Scaffolding System - Metal Plank/Steel Plank: TJHY-SP3 – Huayou Detail:
What is scaffold plank / steel plank
Steel plank we also call them as metal plank, steel board, steel deck, metal deck, walk board, walk platform.
Size: 210*45mm, 240*45mm, 225*38mm, 250*50/40mm,300*50mm
Steel plank is a kind of scaffolding in the construction industry. The name of steel plank is based on the traditional scaffolding plank like wooden plank and bamboo plank. It is made by steel and generally referred as steel scaffold plank, steel building board, steel deck, galvanised plank, hot-dipped galvanised steel board, and is popularly used by the shipbuilding industry, the oil platform, the power industry and the construction industry. The steel plank is punched with M18 bolt holes for connecting the planks to other planks and adjusting the width of the bottom of the platform. Between the steel plank and other steel plank, use a toe board with a height of 180mm and painted black and yellow to fix the toe board with screws in 3 holes on steel plank so that the steel plank can be fixedly connected to other steel plank. After the connection is completed, the materials for the fabrication platform should be strictly checked for acceptance, and the platform should be tested after it is made. The installation is completed and acceptance is qualified for listing before it is put into use.
Steel plank can used in all type of scaffolding system and construction by different types.
Like the steel plank by size 210*45mm, 240*45mm, 225*38mm, 250*50/40mm,300*50mm. this kind of metal plank usually used with tubular system. It is placed on the scaffolding system which set up by scaffolding pipes and scaffolding couplers, and metal plank used in building scaffolding, marine offshore engineering, especially the shipbuilding scaffolding and oil&gas project.
The composition of steel plank
Steel plank consists of main plank, end cap and stiffener. The main plank punched with regular holes , then welded by two end cap at two sides and one stiffener by every 500mm. We can classified them by different sizes and also can by different type of stiffener, such as flat rib, box/square rib, v-rib.
Steel plank 210*45mm, 240*45mm, 250*50/40mm mostly welcomed by South East Asia market, the thickness is 1.0mm-1.2mm, and it is light weight and also save cost compare with other planks.
Basic information
1.Brand: Huayou
2.Materials: Q195, Q235 steel
3.Surface treatment: hot dipped galvanized , pre-galvanized
4.Production procedure: material—cut by size—welding with end cap and stiffener—surface treatment
5.Package: by bundle with steel strip
6.MOQ: 15Ton
7.Delivery time: 20-30days depends on the quantity
Size as following
Item |
Width (mm) |
Height (mm) |
Thickness (mm) |
Length (mm) |
Stiffener |
Metal Plank |
210 |
45 |
1.0/1.1/1.1/1.5/1.8/2.0 |
1000 |
Flat/box/v-rib |
210 |
45 |
1.0/1.1/1.1/1.5/1.8/2.0 |
2000 |
Flat/box/v-rib |
|
210 |
45 |
1.0/1.1/1.1/1.5/1.8/2.0 |
3000 |
Flat/box/v-rib |
|
210 |
45 |
1.0/1.1/1.1/1.5/1.8/2.0 |
4000 |
Flat/box/v-rib |
|
240 |
45 |
1.0/1.1/1.1/1.5/1.8/2.0 |
1000 |
Flat/box/v-rib |
|
240 |
45 |
1.0/1.1/1.1/1.5/1.8/2.0 |
2000 |
Flat/box/v-rib |
|
240 |
45 |
1.0/1.1/1.1/1.5/1.8/2.0 |
3000 |
Flat/box/v-rib |
|
240 |
45 |
1.0/1.1/1.1/1.5/1.8/2.0 |
4000 |
Flat/box/v-rib |
|
250 |
50/40 |
1.0/1.1/1.1/1.5/1.8/2.0 |
1000 |
Flat/box/v-rib |
|
250 |
50/40 |
1.0/1.1/1.1/1.5/1.8/2.0 |
2000 |
Flat/box/v-rib |
|
250 |
50/40 |
1.0/1.1/1.1/1.5/1.8/2.0 |
3000 |
Flat/box/v-rib |
|
250 |
50/40 |
1.0/1.1/1.1/1.5/1.8/2.0 |
4000 |
Flat/box/v-rib |
Product detail pictures:
Related Product Guide:
To create far more benefit for customers is our company philosophy; customer growing is our working chase for Original Factory Frame Scaffolding System - Metal Plank/Steel Plank: TJHY-SP3 – Huayou , The product will supply to all over the world, such as: Slovenia, Niger, Bangladesh, We set a strict quality control system. We have return and exchange policy, and you can exchange within 7 days after receive the wigs if it is in new station and we service repairing free for our products. Please feel free to contact us for further information and we will offer you competitive price list then.
By Astrid from Cancun - 2017.12.09 14:01
We always believe that the details decides the company's product quality, in this respect, the company conform our requirements and the goods are meet our expectations.
By Cora from Iraq - 2017.08.28 16:02