Lowest Price For Scaffolding Steel Prop - Scaffolding Pipe: TJHY-ST1 – Huayou
Lowest Price For Scaffolding Steel Prop - Scaffolding Pipe: TJHY-ST1 – Huayou Detail:
Description
Scaffolding pipe we are now also say steel pipe , it is a kind of steel pipe we used as scaffolding in many constructions and projects. In additonal we also use them to do further production process to be other type of scaffolding system, such as ringlock system, cuplock scaffolding etc. It is widely used in various kind of pipes processing field, shipbuilding industry, network structure, steel marine engineering, oil pipelines, oil&gas scaffolding and other industries.
Compare with steel pipe, bamboo have long been used as scaffolding tubes, but due to their lack of safety and durability, they are now only used in small buildings such as owner-occupied buildings in rural and more backward urban areas. The most common type of scaffolding tube used in modern building construction is the steel tube, as the scaffolding is set up to meet the needs of the workers, but also to meet the stability and durability of the scaffolding, so the strong steel tube is the best choice. The steel pipe chosen is generally required to have a smooth surface, no cracks, not bent, not easily rusted and in accordance with the relevant national material standards.
In modern building construction, we usually use the steel pipe 48.3mm as the outer diameter of scaffolding pipe and thickness from 2.2-4.0mm. It is straight welding pipe and made by high carbon steel. It is used with scaffolding clamps that we also call scaffolding tube and coupler system or tubular system scaffolding.
Basic information
1.Brand:Huayou
2.Material: Q235, Q345, Q195
3.Grade/Standard: STK500, EN39, EN10219, BS1139
4.Safuace Treatment: Hot Dipped Galvanized, Pre-galvanized, Black, Painted.
Size as following
Outer Diameter (mm) |
Thickness (mm) |
Length(mm) |
48.3/48.6 |
1.8/2.0/2.2/2.4 |
1m-12m |
48.3/48.6 |
2.75/2.8 |
1m-12m |
48.3/48.6 |
3.0 |
1m-12m |
48.3/48.6 |
3.2 |
1m-12m |
48.3/48.6 |
3.6 |
1m-12m |
48.3/48.6 |
3.75/3.8 |
1m-12m |
48.3/48.6 |
4.0 |
1m-12m |
38 |
2.0-4.0 |
1m-12m |
42 |
1.5-4.0 |
1m-12m |
60 |
2.0-4.0 |
1m-12m |
Product detail pictures:





Related Product Guide:
Bear Customer first, High quality first in mind, we perform closely with our consumers and provide them with efficient and experienced services for Lowest Price For Scaffolding Steel Prop - Scaffolding Pipe: TJHY-ST1 – Huayou , The product will supply to all over the world, such as: Guinea, kazan, Grenada, All the imported machines effectively control and guarantee the machining precision for the items. Besides, we have a group of high-quality management personnels and professionals, who make the high-quality items and have the ability to develop new merchandise to expand our market home and abroad. We sincerely expect customers come for a blooming business for both of us.

The customer service staff is very patient and has a positive and progressive attitude to our interest, so that we can have a comprehensive understanding of the product and finally we reached an agreement, thanks!
