Factory Supplied Pipe Clamp - Scaffolding Pipe: TJHY-ST1 – Huayou
Factory Supplied Pipe Clamp - Scaffolding Pipe: TJHY-ST1 – Huayou Detail:
Description
Scaffolding pipe we are now also say steel pipe , it is a kind of steel pipe we used as scaffolding in many constructions and projects. In additonal we also use them to do further production process to be other type of scaffolding system, such as ringlock system, cuplock scaffolding etc. It is widely used in various kind of pipes processing field, shipbuilding industry, network structure, steel marine engineering, oil pipelines, oil&gas scaffolding and other industries.
Compare with steel pipe, bamboo have long been used as scaffolding tubes, but due to their lack of safety and durability, they are now only used in small buildings such as owner-occupied buildings in rural and more backward urban areas. The most common type of scaffolding tube used in modern building construction is the steel tube, as the scaffolding is set up to meet the needs of the workers, but also to meet the stability and durability of the scaffolding, so the strong steel tube is the best choice. The steel pipe chosen is generally required to have a smooth surface, no cracks, not bent, not easily rusted and in accordance with the relevant national material standards.
In modern building construction, we usually use the steel pipe 48.3mm as the outer diameter of scaffolding pipe and thickness from 2.2-4.0mm. It is straight welding pipe and made by high carbon steel. It is used with scaffolding clamps that we also call scaffolding tube and coupler system or tubular system scaffolding.
Basic information
1.Brand:Huayou
2.Material: Q235, Q345, Q195
3.Grade/Standard: STK500, EN39, EN10219, BS1139
4.Safuace Treatment: Hot Dipped Galvanized, Pre-galvanized, Black, Painted.
Size as following
Outer Diameter (mm) |
Thickness (mm) |
Length(mm) |
48.3/48.6 |
1.8/2.0/2.2/2.4 |
1m-12m |
48.3/48.6 |
2.75/2.8 |
1m-12m |
48.3/48.6 |
3.0 |
1m-12m |
48.3/48.6 |
3.2 |
1m-12m |
48.3/48.6 |
3.6 |
1m-12m |
48.3/48.6 |
3.75/3.8 |
1m-12m |
48.3/48.6 |
4.0 |
1m-12m |
38 |
2.0-4.0 |
1m-12m |
42 |
1.5-4.0 |
1m-12m |
60 |
2.0-4.0 |
1m-12m |
Product detail pictures:
Related Product Guide:
We depend on sturdy technical force and continually create sophisticated technologies to meet the demand of Factory Supplied Pipe Clamp - Scaffolding Pipe: TJHY-ST1 – Huayou , The product will supply to all over the world, such as: Portugal, Sao Paulo, UK, We confirm to public, cooperation, win-win situation as our principle, adhere to the philosophy of make a living by quality, keep developing by honesty , sincerely hope to build up a good relationship with more and more customers and friends, to achieve a win-win situation and common prosperity.
By Antonio from Tunisia - 2018.12.22 12:52
With a positive attitude of regard the market, regard the custom, regard the science, the company works actively to do research and development. Hope we have a future business relationships and achieving mutual success.
By Georgia from Denver - 2018.09.23 17:37