Bottom Price Stage Scaffolding - Metal Plank/Steel Plank: TJHY-SP3 – Huayou

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We believe in: Innovation is our soul and spirit. High-quality is our life. Consumer need to have is our God for Scaffolding System , Modular Scaffolding , U Head Jack Base , We're prepared to present you with the most effective ideas over the designs of the orders in a qualified way for those who need. While in the meantime, we continue to keep on producing new technologies and building new designs so as to help make you ahead from the line of this small business.
Bottom Price Stage Scaffolding - Metal Plank/Steel Plank: TJHY-SP3 – Huayou Detail:

What is scaffold plank / steel plank

Steel plank we also call them as metal plank, steel board, steel deck, metal deck, walk board, walk platform.

Size: 210*45mm, 240*45mm, 225*38mm, 250*50/40mm,300*50mm

Steel plank is a kind of scaffolding in the construction industry. The name of steel plank is based on the traditional scaffolding plank like wooden plank and bamboo plank. It is made by steel and generally referred as steel scaffold plank, steel building board, steel deck, galvanised plank, hot-dipped galvanised steel board, and is popularly used by the shipbuilding industry, the oil platform, the power industry and the construction industry. The steel plank is punched with M18 bolt holes for connecting the planks to other planks and adjusting the width of the bottom of the platform. Between the steel plank and other steel plank, use a toe board with a height of 180mm and painted black and yellow to fix the toe board with screws in 3 holes on steel plank so that the steel plank can be fixedly connected to other steel plank. After the connection is completed, the materials for the fabrication platform should be strictly checked for acceptance, and the platform should be tested after it is made. The installation is completed and acceptance is qualified for listing before it is put into use.

Steel plank can used in all type of scaffolding system and construction by different types.
Like the steel plank by size 210*45mm, 240*45mm, 225*38mm, 250*50/40mm,300*50mm. this kind of metal plank usually used with tubular system. It is placed on the scaffolding system which set up by scaffolding pipes and scaffolding couplers, and metal plank used in building scaffolding, marine offshore engineering, especially the shipbuilding scaffolding and oil&gas project.

The composition of steel plank

Steel plank consists of main plank, end cap and stiffener. The main plank punched with regular holes , then welded by two end cap at two sides and one stiffener by every 500mm. We can classified them by different sizes and also can by different type of stiffener, such as flat rib, box/square rib, v-rib.

Steel plank 210*45mm, 240*45mm, 250*50/40mm mostly welcomed by South East Asia market, the thickness is 1.0mm-1.2mm, and it is light weight and also save cost compare with other planks.

Basic information

1.Brand: Huayou

2.Materials: Q195, Q235 steel

3.Surface treatment: hot dipped galvanized , pre-galvanized

4.Production procedure: material—cut by size—welding with end cap and stiffener—surface treatment

5.Package: by bundle with steel strip

6.MOQ: 15Ton

7.Delivery time: 20-30days depends on the quantity

Size as following

Item

Width (mm)

Height (mm)

Thickness (mm)

Length (mm)

Stiffener

Metal Plank

210

45

1.0/1.1/1.1/1.5/1.8/2.0

1000

Flat/box/v-rib

210

45

1.0/1.1/1.1/1.5/1.8/2.0

2000

Flat/box/v-rib

210

45

1.0/1.1/1.1/1.5/1.8/2.0

3000

Flat/box/v-rib

210

45

1.0/1.1/1.1/1.5/1.8/2.0

4000

Flat/box/v-rib

240

45

1.0/1.1/1.1/1.5/1.8/2.0

1000

Flat/box/v-rib

240

45

1.0/1.1/1.1/1.5/1.8/2.0

2000

Flat/box/v-rib

240

45

1.0/1.1/1.1/1.5/1.8/2.0

3000

Flat/box/v-rib

240

45

1.0/1.1/1.1/1.5/1.8/2.0

4000

Flat/box/v-rib

250

50/40

1.0/1.1/1.1/1.5/1.8/2.0

1000

Flat/box/v-rib

250

50/40

1.0/1.1/1.1/1.5/1.8/2.0

2000

Flat/box/v-rib

250

50/40

1.0/1.1/1.1/1.5/1.8/2.0

3000

Flat/box/v-rib

250

50/40

1.0/1.1/1.1/1.5/1.8/2.0

4000

Flat/box/v-rib


Product detail pictures:

Bottom Price Stage Scaffolding - Metal Plank/Steel Plank: TJHY-SP3 – Huayou detail pictures

Bottom Price Stage Scaffolding - Metal Plank/Steel Plank: TJHY-SP3 – Huayou detail pictures

Bottom Price Stage Scaffolding - Metal Plank/Steel Plank: TJHY-SP3 – Huayou detail pictures

Bottom Price Stage Scaffolding - Metal Plank/Steel Plank: TJHY-SP3 – Huayou detail pictures

Bottom Price Stage Scaffolding - Metal Plank/Steel Plank: TJHY-SP3 – Huayou detail pictures

Bottom Price Stage Scaffolding - Metal Plank/Steel Plank: TJHY-SP3 – Huayou detail pictures


Related Product Guide:

It adheres to the tenet Honest, industrious, enterprising, innovative to develop new products constantly. It regards customers, success as its own success. Let us develop prosperous future hand in hand for Bottom Price Stage Scaffolding - Metal Plank/Steel Plank: TJHY-SP3 – Huayou , The product will supply to all over the world, such as: Azerbaijan, Egypt, Lyon, We have a large share in global market. Our company has strong economic strength and offers excellent sale service. We have established faith, friendly, harmonious business relationship with customers in different countries. , such as Indonesia, Myanmar, Indi and other Southeast Asian countries and European, African and Latin American countries.
  • Reasonable price, good attitude of consultation, finally we achieve a win-win situation,a happy cooperation!
    5 Stars By Myrna from Angola - 2018.09.23 18:44
    We are a small company that has just started, but we get the company leader's attention and gave us a lot of help. Hope we can make progress together!
    5 Stars By Frederica from Algeria - 2017.08.16 13:39